Monday, March 14, 2011
Log
right now I am waiting for the food grade epoxy for the different parts of the of the pipes in my box. by the end of the week i hope to have all of the water systems done and have the electrical systems ready to be placed in side of the box.
Monday, March 7, 2011
Log
Today I will attach one of the tanks and attach another tank tomorrow. By the end of the week I will have most of the distributional system done
Friday, March 4, 2011
log
This week I accomplished the constriction of the output of the machine and the testing of the marble track. I found smaller marbles were needed to run the machine
Monday, February 28, 2011
log
by friday i will have much more done on my projects, this time i will have the tanks in the box
i will also have the much more of the electrical equipment finished on the project right see my last log for where i am right know
i will also have the much more of the electrical equipment finished on the project right see my last log for where i am right know
Wednesday, February 23, 2011
Log
Today I built and tested the pipes that will carry the lemonade and that will carry the sugar to the cup where it will be served. I found that the pipe transfers 8 lbs in 15 seconds this amount is .33 less then a gallon. there this is much to much water. I also found the the weight for a cubic foot of sugar which turned our to be 53. after this one test needs to be run to calculate the flow rate of the sugar.
Tuesday, February 22, 2011
Log
On my project I have completed the mounting device for the tanks of the box and finished the construction of the box I have completed the power supply and I have also finished the construction of the relay circuits and tested. the completion of the programing and the finishing of the other devices that need to be attached to the micro controller. I also have to mount the different tanks to the box. Other than those things there is nothing that is difficult or challenging in the project.
By Friday there is going to some of the tanks mounted and more of the things that I have at home coming in and becoming placed in the project. More of the electrical system will be completed and more of the different. by the next Friday most of the project should be completed.
By Friday there is going to some of the tanks mounted and more of the things that I have at home coming in and becoming placed in the project. More of the electrical system will be completed and more of the different. by the next Friday most of the project should be completed.
Thursday, February 17, 2011
Log
Today Mrs.Green stated that she would go to the lab to allow us work on our project. I will start construction on the drawers of the machine.
Monday, February 14, 2011
Log
Today created a log about logging. in this log I stressed the importance of logs and how they help the instructors knowing whats going on.
Friday, February 11, 2011
log
today i attached my shelf to the roof of the box to make the place where i will attache the tanks. this is one more thing of my list of things to do i say im around 40 percent done right know including gathering the materials
Tuesday, February 1, 2011
log
yesterday i finished and handed in my mid term exam also called my STEMM report.
Friday, January 14, 2011
log
today i tried to up load my pictures but i ran into problems. the server rejected my pictures and prevented them from uploading
Thursday, January 13, 2011
log
Today I'm working on the coding of the micro-controller in side of the lemonade machine. This information is critical to the success of the project. with out this piece there would be no chance of the machine to work. this device controls the everything from the lights to valves that let the water flow around the machine.
Sunday, January 9, 2011
log
I have acquired all of the parts necessary for the completion of this project. There is a lot to be done but getting the parts is a large step in the right direction.
Monday, January 3, 2011
log
Today I have returned from break and started to work on the construction.
Thursday, December 23, 2010
log
today i posted a log. i am preparing to build my part of the machine starting over break.
Friday, December 17, 2010
New Final Drawing
Today I have started to work on the new final drawing where it pust our final machine into a setting that you would find it real life. This should be finished before break.
Monday, December 13, 2010
Press Release
Today I started to work on my press release to be submitted on Dec the 21. In this short essay I have to go over the project placing a focus on my part of the final design. I should finish this assignment by the end of this week the 18 of December.
Friday, December 10, 2010
Working on imporving my blog
I have started work to improve my blog. there is still much to do and I have only started the overhaul. I hope to get this done before construction.
Tuesday, December 7, 2010
Log
today my blog was reviewed, there are some minor changes but, nothing is major. he told me i needed electrical to make my electrical device safe.
Monday, November 29, 2010
log
Today I am working on my final drawing for the project. this Friday i am going to take a trip to the junkyard to gather materials for the completion of the final product.